{"id":"hk-devb-house-house","title":"Sites for Public Housing Development Estimated to be Completed in the 6th to 10th Years Under the Long Term Housing Strategy","description":"Sites for Public Housing Development Estimated to be Completed from 2028-29 to 2032-33 (Position as at September 2022): Sites for public housing development expected for completion in the second five-year period are mostly still at the planning, engineering or architectural design stage. This dataset sets out the estimated land availability years for these sites under the current work programme.","publisher":{"id":"44a43c13-3b55-4c47-adab-17bafd258f2a","name":"Development Bureau"},"categories":[{"id":"development","name":"Development, Geography and Land Information"}],"tags":[],"resources":[{"id":"42427939-e2cc-4021-929f-bc9604f27420","name":"Sites for Public Housing Development Estimated to be Completed in the 6th to 10th Years Under the Long Term Housing Strategy","description":"Sites for Public Housing Development Estimated to be Completed from 2028-29 to 2032-33 (Position as at September 2022): Sites for public housing development expected for completion in the second five-year period are mostly still at the planning, engineering or architectural design stage. This dataset sets out the estimated land availability years for these sites under the current work programme.","url":"https://portal.csdi.gov.hk/geoportal/?datasetId=devb_plb_rcd_1670236864007_29270","format":"API","language":"en, zh-Hant, zh-Hans","updated":"2023-03-02T18:18:55.330615"}],"sourceUrl":"https://data.gov.hk/en-data/api/3/action/package_show?id=hk-devb-house-house","updated":"2023-03-02T18:18:55.326221","retrievedAt":"2026-10-20T22:31:00.105Z","license":"","licenseUrl":""}